New ramp for Sailability

Published 12:26 on 9 Mar 2022
Although the high water level stopped the works on the foreshore, we were able to improve access to the pontoon at Slipway 6 for the Sailability sailors and indeed for everyone. The old concrete was broken out and new mass concrete poured to provide a level access to the pontoon. The sides were battered in to allow the Challengers to be moved to the launching slip. Looking forward to seeing it assist access to the boats and the water for everyone.
Last updated 11:33 on 29 October 2022